Temporary bidder was highlighted TERNA In two railways in Romania, totaling € 1 billion.
Specifically, TERNA, in a joint venture with Alstom Romania, in two 83-kilometer-long projects, related to the design and complete restoration of the Craiova-Drobeta Turnu Severin-Caransebeș railway line, part of the ORIENT/East Mediterranean.
The auctioning body of the projects is the CFR rail infrastructure administrator.
These projects include the following sections:
- Lot 1: Craiova – Filiași, with a budget of 543,448,600 euros.
- Lot 2: Filiași- Igiroasa, with a budget of 449,206,363 euros.
The duration of the studies is 12 months, and the duration of construction is set at 36 months.
If there is no unexpected, the signing of the contracts is expected at the end of the year.