The 405 MW portfolio acquired by HELLENiQ Energy In Romania and Bulgaria, it marks the group’s entrance into the second market.
At the same time, it is an important step in achieving the Helleniq Energy goal for 1.5 GW of RES projects by 2028. More specifically, the acquisition announced yesterday (7.8.2025) concerns a set of projects quite differentiated, as it includes 96 MW wind farm and 123 MW photovoltaic park.
These are projects that will be operational by 2028 against an investment of € 500 million. An important motivation for Helleniq is the yields, which are estimated to reach 10 – 12%.
It is worth noting that the construction of two energy storage projects in Florina (50 MW / 200 MWh) is also prepared as part of the same target.
Based on the first half -year financial results, the Group’s RES production was reinforced by 7%annually, reaching 188 GWh and EUR 11 million in EBITDA.