Public consultation was set until Friday, June 6, 2025, the draft law of Ministry of Climate Crisis and Civil Protection entitled “Framework for Strengthening Resilience: Provisions for Civil Protection and the Fire Brigade”.
Among other things, the opportunity is given to regional governors To suggest the declaration of an emergency for areas within their administrative boundaries, while its leader is included in the composition of the Risk Assessment Committee. Fire Brigade to enhance operational coordination.
In addition, the draft law is directly linked to the National Protection Program “AEGIS”, which is expected to receive new flying means. According to a statement by the Ministry of Climate Crisis and Civil Protection, the recruitment of firefighters, such as pilots, techniques and engineers, is accelerated and simplified.
In addition, the new framework abolishes the system of written examinations for the recruitment of special tasks. According to the Climate Crisis and Civil Protection Ministry, “Instead, a system of scoring is established with objective and impartial criteria, both for the introduction of individuals into the Fire Brigade and for the transfer of already serving staff”.
Particular care is also taken to strengthen the Health Department of the Fire Department. The new arrangements, as highlighted in the announcement, introduces a “objective system of selection of doctors based on defined scoring criteria, ensuring the provision of quality health services to the body’s staff and the proper functioning of health committees”.
At the same time, Article 11 of the draft law provides for the creation of a new category of Fire Brigade called “Firefighters of General Duties” (PEF), who are recruited for a seven -year term under public law and objective criteria, without written examinations. 150 organic positions are recommended, with a corresponding reduction in organic positions of the other categories, and it is projected to change the number of posts by presidential decree.
Finally, Article 16 redefines the framework of the urban redevelopment of the working houses of the settlement “Lixouri I” in Kefalonia, which were affected by the earthquakes of 2014. The responsibility for the repair of damage is transferred to the Department of Central Greece’s Natural Disaster Impact Restoration Directorate. The Directorate may conclude a program contract with the company “BUILDING INFRASTRUCTURE SA”, which undertakes the implementation of the project and the issuance of the required building permits.
See HERE the full draft law
He fought but Panathinaikos was out of the final in Abu Dhabi, defeated 82-76 by Fener – video
They immediately put him in the operating room but were unable to save him – how he describes the 59 -year -old’s fatal injury by his wife
How … Kim’s pride sank: satellite images from damage to warship after failing